Pre-Commissioning CIP Services for Greenfield Construction | CXP Solutions
Fast-Track Commissioning

Pre-Commissioning CIP Services for Greenfield Construction

America's construction boom demands faster commissioning. Mobile CIP skids, expert flushing, chemical passivation, and validated cleanliness—delivered with owner-led execution for data centers, pharma facilities, and industrial megaprojects.

2-5
Day Turnover
100%
Owner-Led
0
Safety Incidents
ASTM A967/A380
Compliant
48-Hour
Mobilization
Owner-Led
Execution
Complete
Documentation
Mobile CIP
Systems
10+ Years
Experience
Industry Reality

America's Greenfield Construction Boom

Record construction activity creates unprecedented demand for pre-commissioning services. Every delay costs millions—proper system cleaning prevents startup failures.

📊 US Industry Statistics: These figures represent total greenfield construction activity across the United States—not CXP's project count. They illustrate the massive scale of facilities requiring pre-commissioning services.
$40B
Annual US Spending
Data center construction alone
212
Facilities Started
Trailing 12-month count
$220M
Avg Project Cost
Record-breaking in 2025
18-24
Months to Build
Typical construction timeline

The Cost of Improper Commissioning

When pre-commissioning is done incorrectly—or skipped entirely—the consequences are severe.

⏱️

Schedule Delays

Contaminated systems require emergency re-cleaning, often delaying startup by weeks. For hyperscale data centers, each month of delay can erase significant cloud revenue potential.

💰 $1-5M+ per month in lost revenue for major facilities
🔧

Equipment Damage

Debris-clogged pumps, fouled heat exchangers, and blocked control valves require expensive replacement. Warranty claims may be denied if cleaning records are inadequate.

⚠️ $100K-500K+ in equipment replacement costs
Core Capabilities

Complete Pre-Commissioning Solutions

From small component passivation to entire facility commissioning—integrated cleaning, flushing, and validation services.

🚿

High-Velocity Flushing

Remove construction debris, weld slag, and particulate with 5+ ft/s turbulent flow. Staged filtration captures contaminants.

Small loops to entire systems
🧪

Chemical Degreasing

Heated alkaline cleaning removes fabrication oils, cutting lubricants, and organic contamination before passivation.

Fittings to full piping runs
⚗️

Stainless Passivation

ASTM A967 compliant citric or nitric acid passivation restores chromium oxide layer on piping and equipment.

Components to entire systems
🔩

Carbon Piping Cleaning

Specialized cleaning for carbon steel systems including rust inhibitor application for corrosion protection.

Fire protection to process lines
💧

Domestic Water Treatment

Chlorination, sanitization, and disinfection for potable water systems per AWWA standards.

Building risers to campus mains
📊

Hydrostatic Testing

Pressure testing per ASME B31.3 with calibrated gauges, documented hold times, and leak verification.

Individual spools to full systems
🧴

High-Purity Final Rinse

DI/RO/WFI final rinse cycles achieve <2 μS/cm conductivity for pharma and high-purity systems.

WFI loops to distribution
📋

Documentation Packages

Complete turnover packages with flow logs, chemical batch records, temperature profiles, and sign-offs.

Audit-ready for any project
Interactive Guide

Construction Contamination Explorer

Select a contamination source to understand its impact and removal requirements.

Weld Slag & Heat Tint

● Critical Risk

Welding creates slag deposits, heat-affected zones with chromium depletion, and weld discoloration. Improper weld cleaning leaves iron contamination that causes immediate rouge formation during startup.

Heat tint colors indicate oxidation temperatures: straw (300°C), brown (400°C), blue (600°C). All require removal before passivation can be effective.

100%
of welds affected
<72 hrs
to rouge formation
Mechanical
+ chemical removal
CXP Solution: Mechanical prep + chemical passivation restores chromium oxide layer

Fabrication Oils & Lubricants

● Critical Risk

Pipe cutting, threading, and machining operations use oils and lubricants that coat internal surfaces. These organic contaminants prevent proper passivation, contaminate high-purity systems, and pose explosion risks in oxygen service equipment.

140-180°F
cleaning temp
2-4 hrs
circulation time
Alkaline
chemistry required
CXP Solution: Heated alkaline degrease cycle removes all organic contamination

Metal Shavings & Particulate

● High Risk

Cutting, grinding, drilling, and reaming generate metal fines that accumulate in piping. These particles block valves, damage pumps, erode seals, clog filters, and contaminate process fluids.

5+ ft/s
flush velocity
10-100μ
particle sizes
Staged
filtration required
CXP Solution: High-velocity flushing with progressive filtration

Carbon Steel Contamination

● High Risk

Contact with carbon steel tools, rigging equipment, scaffolding, or temporary supports transfers iron to stainless steel surfaces. Even brief contact embeds iron that accelerates corrosion.

Seconds
to embed iron
Invisible
initial contamination
Chemical
removal only
CXP Solution: Chemical passivation per ASTM A967 removes free iron

Gasket Debris & Sealants

● Moderate Risk

Gasket cutting, flange assembly, and sealing operations leave PTFE shavings, elastomer particles, thread sealant residues, and adhesive contamination that foul control valves.

PTFE
most common
Floats
in fluid streams
Fine
filtration needed
CXP Solution: Thorough flushing with fine mesh filtration captures debris
Complete Workflow

Pre-Commissioning Process Flow

Click each step to learn what happens and why it matters for your project.

1

Pre-Planning & Site Assessment

System review, chemical selection, safety coordination

Why This Matters

Proper planning prevents 90% of commissioning problems. We analyze P&IDs to calculate system volumes, identify potential flow restrictions, select appropriate chemistry for your materials, and coordinate with your construction manager to integrate seamlessly with other trades.

Without this step, you risk undersized equipment, incompatible chemicals, scheduling conflicts, and safety incidents. Every dollar spent here saves ten during execution.

1-3 Days
Planning time
P&ID Review
Documentation
JSA/HAZOP
Safety prep
Volume calculations Chemical compatibility Equipment sizing
2

Mobilization & Connection

Mobile CIP skids staged and connected on-site

Why This Matters

Our mobile CIP skids arrive fully equipped—pumps, heaters, tanks, filtration, instrumentation. No dependence on your facility's utilities or permanent systems. We connect via temporary hoses and fittings, which means we can clean your piping before plant systems are operational.

This self-contained approach eliminates delays waiting for electrical, water, or other utilities to be commissioned first. We stage in parking lots, on loading docks, or wherever access is available.

50-500 GPM
Flow capacity
48 Hours
Mobilization
Self-Contained
No plant utilities
Chemical storage Containment setup Hose connections
3

Alkaline Degrease

Heated cleaning removes oils and organic contamination

Why This Matters

Fabrication oils, cutting lubricants, and machining fluids coat every inch of new piping. These organic films must be removed BEFORE acid passivation—otherwise the acid can't contact the metal surface and passivation fails completely.

Heated alkaline chemistry (140-180°F) saponifies oils and emulsifies grease, floating contamination away from surfaces. Skipping this step is the #1 cause of passivation failures.

140-180°F
Temperature
2-4 Hours
Circulation
pH 11-13
Alkaline solution
Temperature monitoring Water break test Rinse verification
4

High-Velocity Flushing

5+ ft/s turbulent flow removes particulate debris

Why This Matters

Construction leaves behind weld slag, metal shavings, gasket debris, rust scale, and dirt. Low-velocity flow just pushes this contamination around—it takes turbulent flow (5+ ft/s, Reynolds >10,000) to actually dislodge particles from pipe walls and low points.

We use staged filtration (200μ → 100μ → 50μ → 25μ) to capture progressively finer particles. Filter inspection provides documented evidence of debris removal.

5+ ft/s
Flow velocity
Re >10,000
Turbulent flow
4-Stage
Filtration
Flow rate logging Filter inspection Turbidity testing
5

Chemical Passivation

ASTM A967 compliant citric/nitric acid treatment

Why This Matters

Stainless steel's corrosion resistance comes from a thin chromium oxide layer. Construction activities damage this layer and embed free iron from tools, handling, and cross-contamination. Acid passivation dissolves embedded iron while allowing chromium to re-oxidize and restore protection.

Without passivation, systems develop rouge (iron oxide contamination) within weeks of startup. Rouge contaminates products, clogs filters, and leads to expensive re-cleaning.

ASTM A967
Compliance
70-140°F
Temperature range
30-60 min
Contact time
Concentration control Temp monitoring Time logging
6

Neutralization & Final Rinse

pH adjustment and high-purity rinse to spec

Why This Matters

Residual acid must be completely removed—any left behind will continue attacking the steel and cause pitting corrosion. We neutralize with controlled rinses, monitoring pH until it returns to 6.5-7.5.

For high-purity systems (pharma, semiconductor), we continue rinsing with DI or WFI water until conductivity drops below 2 μS/cm, ensuring no ionic contamination remains.

pH 6.5-7.5
Target pH
<2 μS/cm
HP conductivity
Multiple
Rinse cycles
pH verification Conductivity testing Drain complete
7

Verification & Documentation

Testing, inspection, and turnover package assembly

Why This Matters

Verification proves the work was done correctly. Copper sulfate testing per ASTM A380 confirms passivation effectiveness. Visual inspection documents surface condition. Documentation packages provide audit trails for quality systems, warranty claims, and regulatory compliance.

Complete records protect you if equipment issues arise later—you can prove proper commissioning was performed.

ASTM A380
Testing standard
Photo
Documentation
Complete
Turnover package
Copper sulfate test Visual inspection Sign-off sheets
2-5
Day Turnover
100%
Owner-Led
0
Safety Incidents
Why CXP

Fast-Track Your Commissioning

Construction-focused approach that prevents startup issues and accelerates turnover.

Rapid Deployment

Mobile equipment staged within 48 hours. Owner-led execution ensures fast decision-making with zero bureaucracy.

📅

Schedule Certainty

Fixed timelines with milestone tracking. Seamless coordination with mechanical completion and startup activities.

🔧

Scalable Capability

From individual fittings to complete facility systems—50-500 GPM mobile CIP sized to your project needs.

Startup Prevention

Prevent pump failures, valve blockages, and heat exchanger fouling with proper commissioning cleaning.

📋

Audit-Ready Docs

Complete packages with flow logs, chemical batch records, temperature profiles, and acceptance verification.

🎯

Construction Expertise

10+ years greenfield experience across data centers, pharma facilities, EV plants, and industrial environments.

FAQ

Frequently Asked Questions

How long does pre-commissioning take for typical systems?

Most systems complete in 2-5 days depending on size and complexity. This includes degreasing, high-velocity flushing, passivation, final rinse, and documentation. Larger multi-loop systems may require additional time. Contact us with your P&IDs for an accurate timeline.

Can you clean both stainless and carbon steel systems?

Yes. For stainless steel, we perform full passivation per ASTM A967. For carbon steel piping (fire protection, cooling water, etc.), we clean, flush, and apply rust inhibitors for corrosion protection during storage or until the system is filled with treated water.

Do you provide domestic water chlorination and disinfection?

Yes. We perform chlorination and sanitization of potable water systems per AWWA standards. This includes super-chlorination, contact time verification, and testing to ensure bacterial counts meet drinking water requirements before turnover.

What size projects can you handle?

Everything from small component passivation (fittings, valves, tubing) up to complete facility commissioning (multi-building campuses with miles of piping). Our mobile CIP skids range from 50-500 GPM, and we can deploy multiple units for larger projects.

What documentation is provided?

Complete turnover packages include: P&ID markups, flow rate logs, chemical batch records with lot numbers, temperature profiles, pH/conductivity monitoring, filter inspection photos, passivation verification (copper sulfate per ASTM A380), and commissioning sign-off sheets.
Get Started

Fast-Track Your Construction Commissioning

Mobile CIP systems, expert execution, and complete documentation for on-time turnover.

What to Include

  • P&IDs or system descriptions
  • Pipe sizes and materials
  • Construction schedule milestones
  • Cleanliness specifications

What Happens Next

  • We review your system requirements
  • Detailed quote within 24-48 hours
  • Schedule coordination with your CM
  • Mobilization and execution